# Proposal Storyboard Template: Editable Worksheet and Example

## What Is a Proposal Storyboard?



A proposal storyboard is a section-level prewriting plan that connects an RFP requirement to the evaluator takeaway, customer priority, win theme, section message, proof, risk, dependency, visual, space budget, owner, and reviewer. It sits between response planning and drafting. For a short proposal, it may be a single table. For a complex bid, it may be a set of linked plans, one for each scored section.



We use the storyboard to make human decisions explicit, then carry those decisions into the response workflow. Our [collaboration features](https://www.arphie.ai/features) support owner, writer, and reviewer roles, question-level comments and tags, and deadline tracking. Our AI agents create first drafts that show the sources used and a confidence level. Our [knowledge integrations](https://www.arphie.ai/integrations) connect Google Drive, SharePoint, Confluence, Seismic, Highspot, and other selected company repositories to that work. The proposal team keeps control of strategy, claim accuracy, and final approval.



![Proposal storyboard workflow from RFP requirements to an approved first draft](https://cdn.prod.website-files.com/672fc2345132970736914b73/6a79debc78471c530ce28c1a_d7e2f6b8-80ab-43da-a6f5-214155c98f22.png)



A storyboard is related to several other proposal planning artifacts, but each has a different job.



| Planning artifact | Question it answers | Typical output |
| --- | --- | --- |
| Compliance matrix | Have we captured every instruction and requirement? | A traceable list of requirements, owners, and response locations. |
| Proposal outline | Where will the response content go? | Ordered volumes, sections, headings, and page allocations. |
| Proposal storyboard | What must the evaluator conclude, and how will we support it? | Section objectives, win themes, messages, proof, visuals, risks, dependencies, and owners. |
| Page mockup | How will the finished pages use space? | A page-level layout of headings, graphics, captions, and text. |



These artifacts can share one workspace. A compliance matrix can feed the requirement field in each storyboard, while the approved storyboard can become the skeleton of the draft. That continuity matters because an orphaned planning form creates more work than it removes.



## Download the Editable Proposal Storyboard Worksheet



**[Download the editable worksheet](data:text/csv;base64,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).**



The CSV opens in Excel and can be imported into Google Sheets. It has 27 editable columns, a reusable prompt row, and a fictional rollout row that is adapted and summarized in the worked example below. Its deadline and resolution-date cells remain placeholders, and its approval date is blank, because those details depend on the live opportunity. Duplicate the prompt row for each scored narrative section. Small factual questions can remain in the compliance matrix or response workspace.



### Proposal Storyboard Template Preview



The preview uses the same field names as the downloadable worksheet.



| Proposal storyboard field | What to enter |
| --- | --- |
| Opportunity | Client and RFP name. |
| RFP reference | Requirement or question ID. |
| Section title | Scored section or narrative question. |
| Submission deadline | Date, time, and time zone. |
| Section due date | Internal handoff date. |
| Page or word limit | Exact response constraint. |
| Evaluator requirement | Verbatim requirement and mandatory response points. |
| Evaluation factor and weighting | Factor, subfactor, and stated relative weight. |
| Customer priority | Buyer outcome and the risk or obstacle behind the requirement. |
| Evaluator takeaway | One sentence describing what the evaluator should believe after reading. |
| Win theme / section message | Customer priority, relevant differentiator, resulting benefit, and supporting proof. |
| Supporting points | Three to five ordered points that develop the message. |
| Proof and source | Approved document, link, metric, case study, delivery artifact, or named expert for each material claim. |
| Evidence owner | Named person accountable for the proof. |
| Planned visual | Timeline, process, diagram, matrix, or other information-carrying visual. |
| Action caption | One sentence stating the conclusion the visual supports. |
| Space plan | Page or word allocation for each point and visual. |
| Writer | Named contributor responsible for the first draft. |
| Subject matter reviewer | Named technical or functional reviewer. |
| Strategy approver | Named proposal manager or deal strategist. |
| Risk | Delivery, compliance, evidence, schedule, or scoring risk that could weaken the section or proposed approach. |
| Dependency | Buyer or internal input, decision, or artifact required before the section can be completed or approved. |
| Open question | Unresolved fact or decision. |
| Resolution owner | Named person responsible for closing the gap. |
| Resolution date | Date the answer or decision is due. |
| Review status | Not started, drafted, in review, approved, or blocked. |
| Approval date | Date the section strategy was approved. |



The evaluator takeaway deserves its own line because the requirement names the writing task, while the takeaway names the conclusion the section should leave. A template that captures the requirement, message, and proof can still leave that conclusion implicit. “Describe our implementation process” is a writing assignment. “The proposed rollout can meet the 12-week deadline because risks are exposed at four acceptance gates” gives the writer a destination.



A win theme is the customer-specific reason your approach should win. The section message expresses that theme in the context of one requirement. The worksheet keeps them together so the writer can connect the priority, approach, benefit, and proof in one testable statement. If the proof field is empty, the message is still an aspiration. The storyboard should expose that gap before it reaches a reviewer.



### Worked Proposal Storyboard Example



The worked example adapts and summarizes the fictional software implementation row in the worksheet. It avoids invented performance claims, so a real storyboard would replace each source description with an approved link, artifact, or validated figure.



| Storyboard field | Example entry |
| --- | --- |
| Opportunity | Fictional 12-week software rollout. |
| RFP reference | Implementation 3.2. |
| Section title | Implementation, migration, training, and governance. |
| Page or word limit | Two pages. |
| Evaluator requirement | Describe the implementation, data migration, training, and governance approach for a 12-week deployment. |
| Evaluation factor and weighting | Technical approach; enter the relative weight stated in the RFP. |
| Customer priority | Launch on schedule while controlling data quality, adoption, and stakeholder coordination risk. |
| Evaluator takeaway | The rollout is feasible within 12 weeks because each phase ends with a mutual acceptance decision. |
| Win theme / section message | A phased rollout with explicit acceptance gates gives the client visibility and time to correct risk before launch, supported by the implementation methodology and migration runbook. |
| Supporting points | Discovery and success criteria; configuration and testing; migration rehearsal; role-based training; launch governance. |
| Proof and source | Approved implementation methodology; validated case study for a comparable deployment; migration runbook; proposed implementation lead's experience. |
| Evidence owner | Implementation lead. |
| Planned visual | A 12-week timeline with four acceptance gates. |
| Action caption | Four acceptance gates expose schedule, data, and adoption risk before launch. |
| Space plan | One-quarter page for the objective; one page for the phased plan and timeline; one-half page for governance and risk; one-quarter page for proof. |
| Writer | Solutions consultant. |
| Subject matter reviewer | Implementation lead. |
| Strategy approver | Proposal manager. |
| Risk | A larger source-system count or data volume could increase migration effort and put the 12-week schedule at risk. |
| Dependency | The client must confirm source systems, approvers, training audiences, and blackout dates before detailed planning is approved. |
| Open question | How many source systems and records are in scope, and who can approve each gate? |
| Resolution owner | Named deal-team owner coordinating with the client data lead. |
| Resolution date | Before storyboard approval. |
| Review status | Drafted. |
| Approval date | Complete after strategy approval. |



That plan gives the writer a clear opening:



>



Our 12-week implementation plan gives the client a mutual acceptance decision at the end of discovery, configuration, migration, and launch readiness. Weekly governance and documented exit criteria surface data, schedule, and adoption risk while the joint team still has time to correct it.



The draft can now expand from agreed decisions instead of an empty page. The writer still tailors the language, checks every fact, and adds the approved evidence.



## How to Create a Proposal Storyboard Step by Step



### 1. Extract the Requirements and Evaluation Logic



Start with the RFP instructions, questions, statement of work, evaluation criteria, attachments, amendments, and issuer Q&A. Break compound requirements into separate, traceable items. Our [RFP compliance matrix guide](https://www.arphie.ai/blog/rfp-compliance-matrix-guide) explains how to map each one to an owner and response location.



For a competitive negotiated acquisition governed by FAR Part 15, [FAR 15.305](https://www.acquisition.gov/far/15.305) says an agency evaluates competitive proposals and assesses their relative qualities solely against the factors and subfactors specified in the solicitation. [FAR 15.304](https://www.acquisition.gov/far/15.304) requires the factors and significant subfactors affecting award, along with their relative importance, to be stated clearly in the solicitation. In that setting, the storyboard should mirror the solicitation's scoring logic before the response team adds creative messaging.



Allocate planning effort according to score, complexity, and risk. A heavily weighted technical approach needs a deeper storyboard than a pass-or-fail administrative field.



### 2. Write the Evaluator Takeaway



Define one conclusion for each section. Write it as a complete sentence from the customer's perspective. It should address the outcome or risk behind the question rather than repeat the requirement.



For example, “The migration approach limits data loss and schedule risk through two rehearsals and client-approved reconciliation criteria” gives the writer a destination. “Explain migration” only restates the task.



### 3. Build the Win Theme, Section Message, and Supporting Points



Translate the opportunity's win theme into a claim that fits the section and that your evidence can support. Then order the supporting points so the evaluator can follow the reasoning. A useful sequence is customer situation, proposed approach, operating detail, proof, and resulting benefit.



A security section, implementation section, and customer support section should express the broader win theme differently. Our guide to [RFP storytelling](https://www.arphie.ai/blog/why-storytelling-wins-rfps) goes deeper on connecting the customer's situation, your approach, and credible proof.



### 4. Attach Proof Before Drafting



Match every material claim with approved evidence. A proof point can be a customer result, product capability, delivery artifact, certification, named expert, or documented process. Record the exact source and its owner. Mark missing evidence as a gap with a due date.



With Arphie, our AI agents retrieve relevant material from the connected repositories selected for the project and generate a first draft with sources and confidence signals. Named reviewers can inspect the support, comment on a question, and resolve uncertain items before approval. This keeps evidence retrieval inside the response workflow while the writer and reviewer remain accountable for every claim.



### 5. Plan Visuals and Space Together



Choose visuals based on the decision they help the evaluator make. A timeline can establish schedule feasibility. A responsibility matrix can clarify governance. A solution diagram can show how data moves and where controls apply.



Give each planned visual an action caption that states its takeaway. Reserve its page or word-equivalent space in the storyboard. This prevents the common late-stage tradeoff where a useful diagram is squeezed into an already full section.



### 6. Assign Named Owners and Reviewers



Every section needs a writer, evidence owner, subject matter reviewer, and strategy approver. Assign people by name and set resolution dates for open questions and dependencies. “Ask security” is an unmanaged dependency. “Security lead approves the encryption statement by Thursday” is a managed action.



Keep the early review focused on strategy, compliance, technical accuracy, proof, risks, and dependencies. Sentence-level editing belongs in the draft review.



### 7. Approve the Storyboard, Then Draft from It



Run a time-boxed review before full drafting begins. Approve a section only when:



- Every applicable requirement has a response location.



- The evaluator takeaway addresses the customer's priority.



- The win theme is translated into a section-specific message.



- Material claims have approved proof or a named evidence owner.



- Planned visuals communicate a defined conclusion.



- Risks are explicit and have a mitigation or named owner.



- Dependencies and open questions have owners and resolution dates.



- The writer and reviewers accept their assignments.



Move the approved headings, supporting points, source links, and visual placeholders directly into the draft. Keep the storyboard linked to the response so amendments and solution changes remain traceable. Review the first draft against both the storyboard and compliance matrix.



## Match the Storyboard Depth to the Opportunity



Storyboarding every response at the same depth wastes time. Use the smallest planning artifact that still resolves the team's decisions.



| Response type | Appropriate planning depth |
| --- | --- |
| High-value, multi-volume, or multi-author proposal | Full section storyboards, formal approval, page mockups, and traceable change control. |
| Short RFP with several scored narrative questions | One lean storyboard row per question, including takeaway, win theme, proof, risk, dependency, owner, and limit. |
| Familiar proposal led by one writer | An annotated outline with the same core fields in compressed form. |
| Fixed-cell questionnaire with mostly factual answers | Requirements tracking, source-backed answer retrieval, and human approval. Reserve storyboards for differentiating narrative fields. |



This tiered approach keeps the storyboard from turning into a first draft in disguise. The planning phase should settle what to say, why it matters, and how to prove it. Drafting handles the finished prose.



## Common Storyboarding Failures and Better Fixes



| Failure | Better operating rule |
| --- | --- |
| The storyboard becomes a long mini-draft. | Limit it to decisions, ordered points, evidence, visuals, gaps, risks, dependencies, and ownership. |
| One rigid form is forced onto every section. | Keep the core fields and add optional fields only where the score, risk, or solution demands them. |
| The storyboard is abandoned after kickoff. | Move approved content directly into the draft and use the storyboard as a first-draft review baseline. |
| A generic win theme appears without a section message. | Translate the opportunity theme into a customer-specific claim for the section and attach approved proof. |
| Risks and dependencies remain in meeting notes. | Put each one in the storyboard with a named owner, action, and due date. |
| Open questions are assigned to a department. | Assign every gap to a named person with a resolution date. |
| Reviewers edit sentences before strategy is approved. | Separate storyboard review from draft review and give each gate explicit acceptance criteria. |